• +1(915) 581-0461
  • [email protected]
  • 660 Rosinante Rd El Paso Texas 79922
Twitter Facebook Instagram Pinterest
A black and white image of the solar solutions logo.
  • Home
  • About Us
  • Service
    • Solar Installation
    • Solar Sales
    • Solar Electric Systems
    • Backup Generators
    • Pool Heating Systems
  • Locations
    • El Paso
    • Lubbock
    • Midland
    • Odessa
  • Gallery
  • Contact
Menu
  • Home
  • About Us
  • Service
    • Solar Installation
    • Solar Sales
    • Solar Electric Systems
    • Backup Generators
    • Pool Heating Systems
  • Locations
    • El Paso
    • Lubbock
    • Midland
    • Odessa
  • Gallery
  • Contact
Call Agent
(915) 581-0461
Book a consultation
Install Solar Panels in El Paso TX

How Long Does It Take To Install Solar Panels?

Once you have decided to install solar panels, the first query is how long it will take. In this article, you can find complete information related to the solar panel installation period. From beginning to end, there are multiple steps to be followed or implemented, i.e., paperwork, approval or application, etc. Still, we will explain the estimated time to install it from start to end. 

Factors that impact the solar panel Installation Duration 

If you have no solar panel on your property before hiring the installer, the time to install it depends on some factors. It might take a few weeks or as long as half a year. The duration of solar panel installation and its running time depend on the following factors: Here are the crucial factors you need to know 

  • Solar Installation Company

How long or how soon the solar panel is installed varies from company to company. If your assigned company has professionals with years of experience in the field, they can complete the installation on time. Sometimes the installation companies have multiple projects to do simultaneously, and because of their busy schedule, the duration of your panel installation increases. That is one of the significant factors you must consider when choosing a company. 

  • Local permitting and inspection processes 

Before starting the installation, the company has to apply for a permit for solar installation from the local government. The required license depends on the property or location; sometimes, only a general electric permit is required. The permit offices also take time to process, and consequently, your installation work is delayed. The government offices also visited your property to inspect the area or the solar panel standards. At this point, time is also required. 

  • Size and type of solar panel installation 

First, the number of solar panels required also decides the duration of installation. If you need to install more solar panels, then it certainly takes more time, but similarly, solar takes less time. Further, if you choose a high-quality solar panel, then it may be installed soon. Plus, if the solar panel is big, its installation will take time compared to a small solar panel. 

  • Property characteristics 

Property matters a lot for solar solutions. In residential areas, most solar panels are installed on the roof, and for this purpose, you have to prepare the roof and meet all the necessities. Further, in the business area, solar panels are installed on the ground, and the professionals have to work on the ground. To prepare the land, they have to make sure of the electrical approach. Property characteristics are also taken into account before proceeding. 

  • Utility company and interconnection

If you are required to connect your solar panel to the grid, it will take more than three weeks to finish. Installers have to apply to your utility company, so it may also take time. The application is about connecting the solar panel with the grid. The utility company approved the application after visiting the property. Sometimes, they ask for net metering, which makes your duration long. 

Final thoughts

These are the duration factors that you need to focus on when it comes to installing solar panels. To decrease the duration, you must check with the company’s professionals and their working hours. A local inspection is necessary before installing the solar. If you want to minimize the duration, you must work on these factors and make your installation process fast. 

avatar image for Admin

Admin

A black and white image of the solar solutions logo.
  • (915) 581-0461
  • [email protected]
  • 660 Rosinante Rd El Paso Texas 79922

Service

  • Solar Installation
  • Solar Sales Services
  • Solar Electric System
  • Backup Generators
  • Pool Heating System

Pages

  • Home
  • Blogs
  • About Us
  • Our Services
  • Gallery
  • Contact Us

Subscribe our newsletter to get our latest update & news

    Designed & Developed By Digital Drive Pro